Life Sciences Building Highlights Y's South Side
2014-11-01-Utah Construction and Design Magazine
After 32 months of construction, the 265,000 SF Life Sciences Building opened its door to students in August. The building’s size and location, coupled with a beautiful brick exterior and glazing system, make it a hallmark on campus.